Guys, Im building a 5EFHE engine for competition use. Its nothing fancy, just a standard spec rebuild. Its had a reground crank, new bearings, new rings and head work. Im a bit worried about running it in, and bedding in the rings. Ive done some searching and found some info but it all involves a lot of time. I am probably going to be left with only a week or two to bed it in before it needs to be bouncing off the limiter when used at an event. It is a road legal car so it will be possible to clock up some km's, but can anyone advise on the best way to run it in without covering thousands of kilometres?