So a little more progress was made over this weekend.
Got rid off the shocking looking plastic which holds the injector loom and made it a lot tidier. TrisK gave the fuel rail a good polish.
After this was all done inlet was all fitted and polished the throttle bodie.
Battery try removal and fix on the minor crash damage. Battery is being relocated into the boot