About time I started a build thread for my new project that's been on going since last winter. I started off with a black forged glanza with panel damage to the rear quarter with the intentions of repairing it and getting it back on the road.

068B528D-1B0A-4A78-96B1-6CBD3E926718_zps

However plans changed and I decided to re shell the engine and running gear into a white 98 spec glanza, ive always liked the white 98 specs previously owning one a year before this and regretting selling it.

my old 98 spec

29EE35F9-99B8-4A99-B4D3-53F5ACC42F47_zps


I purchased a very clean solid base off of e bay late last year. The car ran well as it was, hadn't been modified which Is what I wanted.

the day the car arrived

767_zps80bd9270.jpg.

So the work began. Removed the old engine and gearbox out of the black glanza, then taking the engine and gearbox out of the white one.While the engine was out, that got a very good clean also a fresh coat of vht paint. Then came the cleaning and painting of the actual bay, degreasing all the old grime,dirt and grease it was a task but well worth it. That took 3 days to get the engine painted and cleaned with a fresh coat of polish and wax to keep the shine. unfortunately I cant find many photos of this stage I will upload them if and when i find them. I also ordered a td04 turbo kit from wepr externally gated evolution style manifold, looks great, running the tial wastegate with .8 bar spring.

the engine all finished and cleaned

258_zpsca53aad4.jpg

Next was to drop the engine and gearbox in, very carefully. The car then got jacked up! Me and my Dad pushed the engine and gearbox in using a pallet truck, we then slowly let the car down to the new height of the engine. Then got the mounts lined up & bolted up. (not as easy as it sounds)

After that, connected all the electrics up and water lines etc. All new roose motorsport hoses were installed with fresh jubilee clips as the old ones were looking a little tired, as well as replacing all the bolts in the engine bay for new ones with spring washers etc, just to freshen everything up. Whilst fitting the turbo kit, we realised the screamer pipe didn't fit with the radiator pipe in its current position so I went to see dean at rw developments and had him re weld my radiator port and also had him make me a race spec rocker cover with fittings and I also purchased one of his catch tanks :)

After hours of cleaning the bay & engine it was time to take a step back and look what we'd achieved. Great results! Also a very fresh looking bay.

Next was to upgrade the brakes, I dropped lucky and found a set of wms brakes brand new never been fitted with all brackets etc for a great price. They are a great fit we had the trim the dust cover surrounding the disc to stop any catching and fit 5mm spacers on the wheels to allow some clearance. I bought some brand new ebc yellow stuff pads for them as well. Braided lines all round were also fitted,rebuilt the rear brakes and greased all the cables, piston etc to make sure they worked well after being stood for a while.

Whilst the wheels were off the inner arches got a deep clean to bring them back up like new and a fresh coat of paint as well as removing all the dirt and muck that builds up over the years.

The wheels got a very good clean inside and out. Along with a polish/ wax to protect them and keeping that shine. So far I am running 195/55/15 purely because they are the tyres that came with the car, which are like new. I am looking to purchase some new tyres with a slightly lower profile and perhaps slightly wider as I am going on track at japfest 2!

Anyway the car stood for a little while with the engine in but was not set up or anything as other projects had unfortunately taken priority. so with some spare time I wired in the e manage blue harness and getting it ready so that it could be mapped and set up properly. with the car looking a mess on the outside we decided that it would be better to get everything running right before doing anything with the exterior, so with everything ready we sent the car off for mapping on a low loader.

The day came where the car was going to get mapped but during the pre dyno inspection we encountered a problem with one of the injectors, unfortunately the injector had failed so that put the mapping back another couple of weeks as new injectors had to be ordered in from America. I went for the 410cc Honda race series injectors on advice from the tuner and intended to run the fpr at a pressure that would be around the same as the 460cc injectors that were installed previously.

Fortunately the next time I went for mapping there were no more teething problems and everything went smoothly with the car, it produced 200 wheel horse power which I was relatively happy with.

the deadline of getting the car back from mapping and japfest left us with 3 days to sort out the bodywork, I bought a brand new bodykit that ive rarely seen on a glanza to make it stand out a bit and have something different, so the first thing was to get that all fitted and lined up properly. next was to prepare the rear quarters for paint as both sides have seen better days and also the door shuts where the old sideskirts in the past had been tiger sealed, needed repairing and painting.

231_zpsb3e82dd5.jpg

219_zps09328ffd.jpg

one day to go til japfest was a mad rush to get everything fitted up and cleaned and ready to go

268_zpsa1a72f57.jpg

262_zpsff356dd5.jpg

261_zps07dba694.jpg

japfest photos:

001_zpsc909f5f8.jpg

323_zpsf3a776cb.jpg

322_zps1fd7737f.jpg

320_zps3382d248.jpg

319_zpse3cb73eb.jpg

313_zpsfa76cb14.jpg

The next updates will be fitting a pair of driveshafts as the current ones have had it. it also needs a new rad fan as that's stopped working aswell, but other than that its going to be staying as it is.

I have booked some track time at japfest 2 so I will be changing the front and rear bumpers for standard ones for track use as I don't want to spoil the fresh paint or risk damaging them.

I'll also post up a spec list of what its running so far

I will also be removing the rocker cover to polish it up to a mirror shine very soon. I'm also looking to buy some new aftermarket wings for the car aswell

I think progress has gone well so far

From this

IMAG0171_zps3cl0bdy2.jpg

To this

261_zpsec82f849.jpg

Link to post
Share on other sites
  • 1 month later...

The run down to jf one highlighted a few niggles with Matts car tgere was a funny knocking noise ioon taking up the drive.bearing in mind tge works tgats been carried out, all suspension removed cleaned painted and poly busged not sure where niuse was from, some xareful listening and testing revealed no play anywhere !

Just replaced outer cv joint on passenger side.so much better, now ordered full joint kit from iddy, just waiting arrival hopeful in time to be fitted to make clumber park thus Sunday.

All silcon hoses finally replaced under the bonnet.

Hopefully have a nice change of wheels coming soon.

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...