The engine bay tidy continues, managed to get some cleaning done and plumb in some more green. Not completely happy with the radiator hoses and i sheered a bolt on the bottom bracket for the rad so that needs a bit of work before giving the system a good flush and refilling with Toyota red! The power steering reservoir had been bodged on a bit during the engine conversion and the hoses were knackered so off that came to be relocated forward in the bay (might look into getting RW Developments to make me one up to match the catch can). I also gave carbon wrapping a crack and had a go at my cooling panel, longterm plans are for a genuine carbon fibre one but for now im pretty pleased with the result! Started heat wrapping the exhaust manifold (on the car again despite vowing never to do it fitted again, dont want to risk developing issues by removing it) fiddly job and looking to be more costly than expected, went through a 15 ft roll of 1" DEI exhaust wrap on only 2 branches of the manifold and have had to order 2 more rolls to finish the job! A few packages turned up this week so test fitted the belts and gauges (oil temp/pressure) Due to a vented n/a bonnet being a ways down on my to-do list and because i think it looks mean..........lil bonnet raise