Jump to content

Recommended Posts

Posted

Cheers man

Thanks for the support.

Its just time really working against me.

#Engine Running

#Bodykit and other parts fitted and sprayed.

#Emanage Base Tune

#Gather remaining parts for ITB setup and fit them/base tune

#Final Tune and RR

#Track Days

There's still much work to be done.

  • Replies 2.1k
  • Created
  • Last Reply

Top Posters In This Topic

Posted

Project Red EP91 5EFHE Rebuild Update

I picked up the gearbox last night which is sorted but it still needs a drive shaft seal.

Have ordered one off Sheekey. I also dropped off the other body parts to my body shop.

I also needed a new timing belt pulley which I got hold of so my mechanic can now work on the aux belts.

The paddle clutch has now been fitted which Im pretty happy about.

The engine bay parts have been all sprayed up so will be collecting those soon.

The red I used for my brake calipers have been used for the strut brace ends, radiator brackets, engine damper brackets and bmcs brackets.

A metallic gold for the timing belt cover, engine damper and bmcs stopper piece.

Will be interesting to see how they look in the bay.

All being well the car should be running by the end of the week.

Posted

Its looking good now Jay.

Thanks for your support man.

Im dying to fire her up lol.

Much kudos to M16Chris for all his help and services also.

Posted

Project Red EP91 5EFHE Rebuild Update

Exedy Racing Clutch Fitted

CIMG0938.jpg

CIMG0944.jpg

CIMG0948.jpg

Quaife'd Gearbox Photos (seal now acquired!)

CIMG0939.jpg

CIMG0940.jpg

For the rest of the day will be cleaning the engine bay and painting the block.

All going well she should be running real soon.

Posted

Cheers tucka.

I didnt manage to take pics of the body parts so you'll all have to wait til its all sprayed and fitted ;)

It got dark so the engine bay cleaning will take place tomorrow, want to fit the tc shifter kit also.

Posted

It arrived this morning Si, many thanks for that.

Its being dropped off at my bodyshop so will check the condition later.

Im sure it will be 100% tho.

Cheers bro.

Posted

Project Red EP91 5EFHE Rebuild Update

Engine is in!

Few small bits to sort then it will be start up time!

CIMG0951.jpg

CIMG0952.jpg

CIMG0953.jpg

Detailing coming soon.

Most importantly she needs to get running first.

Still more work to be done...

Posted

Thanks for the kind words guys.

She is all up and running now and while its still too early to judge, she is pretty nippy.

Its the breaking in period now so Im off to do some of that lol.

Peace

Posted

JOZ u sick guy!lol.. Happy for u bro! bet your buzzin inside! lol.. u kept it in u al this time!lol.. Let us know how it is!! safe bro.

STAR

Posted

Thats the first 50 odd miles covered so she is all ready for the first oil change.

Have been keeping her at 4k revs max with varied driving, some half and wot.

The paddle clutch is hard to get to used to as the biting point is so small but is very responsive.

The biggest difference I've felt so far is the LSD, it makes cornering a cinch with bodyroll, oversteer etc a thing of the past.

Still some way to go but I should have her booked into the bodyshop soon to get her makeover.

Im going to change the oil at 200 then 500 miles, then it will be time for emanage.

The 4efe ecu accepted the 5efhe injectors which was a good sign.

Thanks for all the support.

Posted

good to hear dude, how does it feal right now though?

have you got th itb's on aswell?

watch that lsd though, they can drag out the back end if you dont know what your doin :thumbsup:

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...