Went on a long trip on bank holiday Monday to Suffolk to pick up a complete DC2 subframe for the K-Swap stripped it down for a good clean up and a re-paint Zinc coated subframe bolts Started my wire tuck, Pulled all my wires though the door grommets My copper brake line came with my AN-3 fitting for the brake line tuck