Jump to content

Recommended Posts

Awesome build so far. Keep it up. :)

Cheers Iddy!

Chris please stop, you're making me want to spend money I don't have haha.

But seriously, AWESOME attention to detail. Looking forward to seeing this all coming together :thumbsup:

Haha Chris, how's yours coming along anyway? Cheers dude

*droooool* my ep82 wants to be like your ep91 when it grows up.

LOL

Cracked on with the rear calipers tonight, I will say one thing, I never want to look at a fecking rear caliper again! Such a fiddly job to do.

DSC_0203_zpsfzkftra8.jpg

Link to post
Share on other sites
  • Replies 698
  • Created
  • Last Reply

Top Posters In This Topic

So much attention to detail man, it pays off mate, awesome

Cheers dude!

Been quite busy behind the scenes with small things that are taking up a lot of my time. Prep work has been done and I hope to get the front & rear suspension built up this weekend.

In the mean time I have have taken a few photos of things I've actually done, having been bothered photographing everything; but I will get round to it.

A few shots in the mean time though.

Mounting flange for the ITB'S arrived; which needed a bit of tweaking for the ITB's not to jam.

DSC_0228_zpsj6waarge.jpg

DSC_0229_zpstmuj5yrh.jpg

Rear axle ready for mounting

DSC_0240_zps0kepx11l.jpg

And gearbag shiming/tweaking going on also.

DSC_0242_zpsgzr4nwn4.jpg

Link to post
Share on other sites

Gearbox now shimmed & back together, ready for powdercoating.



Last few bits & pieces ready for powdercoating.



Some photos of parts ready to go back in.



Arms with SuperPro bushes



DSC_0274_zpsu2xpf2dt.jpg



Top mounts painted up & bolts renewed - not entirely happy with these as the bolts won't tighten correctly and I've no access to get an Allen key on them, might revert back to standard ones, but powder coated.



DSC_0275_zpssiuileki.jpg



Wheel bearings renew with OEM ones.



DSC_0276_zpsp853se4b.jpg



PAS rack fitted, new boots & track rod ends too. Also, brake bias valve.



DSC_0293_zpsuybdmg8q.jpg



Hubs, Arms, Brakes & suspension assembled.



DSC_0287_zpsxkqzrjpp.jpg



DSC_0287_zpsxkqzrjpp.jpg



DSC_0287_zpsxkqzrjpp.jpg



DSC_0290_zpstwhdsv48.jpg



DSC_0292_zpsiuogs2qf.jpg



Off the axle stands and out of the garage for the 1st time in 18 months.



DSC_0294_zpstq99ebwa.jpg

Link to post
Share on other sites
  • 4 weeks later...
  • 3 months later...
  • 2 weeks later...
  • 3 months later...

Lovely :D

Thanks

shiny. SHINY!

Did your alternator pulley fit right? I didn't fit mine in the end because it was touching the casing...

I haven't tried the alternator yet, need to Polish it up first.

Got the fuel rail, regulator & rx8 injectors fitted.

post-7319-0-77123700-1454018134_thumb.jp

post-7319-0-85453500-1454018161_thumb.jp

Link to post
Share on other sites
  • 3 weeks later...

Cheers.

Small update, finally getting some brake pipes sorted. Managed to get a set to be left with a local company to make a full set of replacements as I could really refresh them the way I'd like.

Should also have another surprise by the weekend.

Link to post
Share on other sites
  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...