Sounds like a plan Zac. Prince I'll be back in Birmingham next month, I'll PM you when I'm there. Managed to make a little start on the engine build this evening. Picked these up earlier; Toyota engine gasket set, Toyota oil pump, Gates timing belt Also picked up the head and block from the engineers. The block has been deglazed, so it's ready to build. After a lick of paint of course! Cleaned up for paint Piston ring gaps on the new build = 0.418mm Ring gaps on the previous 4E build = 1.607mm ;) While I was painting the block, my mate gave the pistons a clean up. Block cleaned and painted Cylinder head Polished crank And how the pistons look after a great effort from Usman (my mate who has literally build the whole car with me) Just waiting on the bearings to arrive before assembling the engine, hoping they arrive today.