Jump to content

Rob_bower's 242 bhp SR - Refresh and fueling upgrades.


Recommended Posts

  • Replies 1.3k
  • Created
  • Last Reply

Top Posters In This Topic

It was a good day yesterday tinkering lol even if it was a bit on the chilly side lol but it was sure sounding a lot better when we had done even if we were making more jobs as we went along lol

Yea it was cold. Definitely sounds better, still not 100% though. It's not our fault things kept breaking. Lol thanks for the help though dude it was much appreciated. I think we ironed a few bits out. Shame about the battery/charging/holding charge issue. Something not right somewhere. Once that's sorted I can start figuring out the rest of the wiring issues.

Link to post
Share on other sites
  • 4 weeks later...

Couple of things:

1. Your reverse light isn't working

2. Stop eating the food at work, it dropped loads when you got in!

3. Glad to see it running :p

1) you dont need them not an mot requirement

2) I know

3) Thanks Dude :)

Link to post
Share on other sites

Not alot to get it road worthy dude just a couple of bits and pieces.

New wheel bearing

Tidy up the wiring

Wire int he stereo

Wire in rear fogs

splice in the roof loom (no heated rear screen, interior lights or no plate lights)

Firbreglass the front bumper

Try fuel reg now pressure issue is sorted

Fit lower arms NEED POLYBUSHES

Fit Front ARB NEED POLYBUSHES

Make new cooling panel.

fit turbo timer. need to order harness

Wire in alarm.

Refurb wheels.

Fit rear beam. need caliper

Fit zep braided lines.

Find some front brakes.

Underseal

Get Mapped

Link to post
Share on other sites

Coming together dude, yeah reverse light only has to work if its there, jdm rears = mo reverse light :)

What front brakes you looking for? Disc pads calipers or big upgrade?

Ill be looking for something a little more substantial. Currently running glanza grooved discs and project mu pads.

Link to post
Share on other sites
  • 2 months later...

With the help or socks we managed to smash loads of jobs off the list today. I'm feeling much more confident in getting this done for japfest.

So as the job list stands.

New wheel bearing

Tidy up the wiring

Wire in the stereo DONE

Wire in rear fogs DONE

splice in the roof loom (no heated rear screen, interior lights or no plate lights) DONE

Firbreglass the front bumper

Try fuel reg now pressure issue is sorted

Fit lower arms NEED POLYBUSHES

Fit Front ARB NEED POLYBUSHES

Make new cooling panel.

fit turbo timer. need to order harness

Wire in alarm.

Refurb wheels.

Fit rear beam. need caliper

Fit zep braided lines.

Find some front brakes.

Underseal

Get Mapped

wire in avcr.

Retrim spg.

It's getting there to be ready for the mot. Just really the wiring to tidy up for the mot. Anything else is just extra.

Just need a couple of days on the car.

Thanks again to Matt. Was great to have a fresh set of eyes to help and bounce ideas off.

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...